Contact Us:4009-606-596
Inquire Now

Smart Construction | Corerain X The Construction Management Platform in Northern China

Introduction

In 2021, the Housing and Urban-Rural Development Department of Shandong Province issued a guide for a smart supervision platform to fully implement the three-star (AAA) level construction site, and the evaluation criteria clearly put forward the intelligent analysis system into the scope of smart construction. This platform is developed under the guidance of the policy.

Challenges
High Accident Probability
High Accident Probability
Construction sites are mobile in terms of people, machines and materials, with a large number of temporary facilities, and many high-risk operations, thus safety accidents are easily triggered.
Difficulty in Safety Management
Difficulty in Safety Management
Influenced by varied quality and weak self-protection awareness, the workers' violations are frequent and hard to control using the supervision system without pre-warnings.
Solutions

Corerain have made a significant contribution in the developing of the Construction Site Management Platform in  Northern China, deploying 1 Nebula X6A Edge Station per site, accessing 500 camera video streams for analysis through algorithms such as open smoke and fire, personnel intrusion, and personnel fall recognition, and building a rapid response mechanism for hazards, to strengthen the efficiency of site safety management.

Results
An intelligent video analysis system is built to achieve on-site safety hazard detection, personnel dynamic management, operational protection, and improve the speed of emergency response and disposal of events.
An intelligent video analysis system is built to achieve on-site safety hazard detection, personnel dynamic management, operational protection, and improve the speed of emergency response and disposal of events.
Passive supervision is changed into active supervision, forming a management mode of  “pre-warning before the event -interference in the event-standardization after the event”,  effectively makeing up for the defects of traditional methods and technologies in supervision.
Passive supervision is changed into active supervision, forming a management mode of “pre-warning before the event -interference in the event-standardization after the event”, effectively makeing up for the defects of traditional methods and technologies in supervision.

Accelerate AI Deployment with Next-Gen Computing Platform

4009-606-596

Contact us:contact@corerain.com

Sales contact:sales@corerain.com

Media cooperation:media@corerain.com

Shenzhen | 14F, Changfu Jinmao Building(CFC), Trade-free Zone, Futian District, Shenzhen, Guangdong, China

UK | Kemp House,152-160 City Road, London, EC1V 2NX

Shanghai | Room C509, 5F, Building C, Hongqiao Wantong Center, No.333 Su Hong Road, Minhang District, Shanghai, China

Shandong | 14F, Building 3, Future Innovation Park, 3 Gangxing Road, Licheng District, Jinan, Shandong,China

Shanxi | Room 1211, 12F, Building T1, Lai 'an Center, 1111 Yanta Road, Qujiang New District, Xi 'an, Shaanxi , China 

Liaoning | Unit 064A, 6F, Huahang Building, 77 Wenhua Road, Heping District, Shenyang, Liaoning , China

Chat Now
Call Us
4009-606-596
Cooperation
Top